|
|||||
Arch from ICDS end hi-res |
Arch from NICL side hi-res |
Arch hi-res |
Assembling the drill tower hi-res |
||
Back side of arch hi-res |
Bore hole hi-res |
Drill motor section hi-res |
Drill side of the arch hi-res |
||
Drill site 2 hi-res |
Drums of drilling fluid outisde of the arch hi-res |
End of drill with an ice core in the barrel hi-res |
ICDS DISC Drill crew 1 hi-res |
||
ICDS DISC Drill crew 3 hi-res |
Jayred and Krissy working on the tower base hi-res |
Jayred taking the drill setions apart after a drill run hi-res |
John and Tanner pushing out an ice core hi-res |
||
Krissy running the chain saw hi-res |
Looking down the drill hi-res |
Looking up the drill cable from the bottom of the arch hi-res |
Lowering the 18,000lb winch drum into place hi-res |
||
Lowering the tower base hi-res |
Lowering the winch level wind into place hi-res |
Moving the tower base hi-res |
Panorama of the inside of the drill arch hi-res |
||
Placing the level wind hi-res |
Pulling the orange container off the cargo sled hi-res |
Pulling the winch with the 953 Cat hi-res |
Pushing the level wind into the building hi-res |
||
Pushing the winch drum into the arch hi-res |
Pushing the winch with the 953 Cat hi-res |
Screen cleaning system hi-res |
Side entrance to arch hi-res |
||
WAIS Divide Camp hi-res |
Winch level wind inside the door hi-res |
||||
| Copyright © WDOP | |||||